Septic & Excavation Contractors: We Help You Grow By Getting You The Right Jobs & Recruiting The Right People To Do Those Jobs.

septic business marketing case study
excavation company marketing case study

What Real Excavation & Septic Operators Say After Running the Numbers

"I can breathe now, it has helped the calls come in, we have all the key components in place and are super busy."

"We're definitely busier, at the point of picking and choosing the jobs we want."

"Life is good! We get a lot of form fills about different projects and can decide to do it or not... It works out great."

"Everyday gets better, I can't say enough good things"

"You've always given me what I've asked for, the leads have been there."

"Our customer base has expanded, we are seeing a very good return on our investment."

"You've come in and helped us target better clients."

Listen To The Excavation Profits Podcast For Expert Interviews & Trainings Each Month!

Attract & Convert Your Ideal Excavation, Demo & Septic Jobs!

The excavation industry has been underserved for too long when it comes to quality marketing that drives consistent results to the bottom line. See the difference partnering with an excavation marketing agency that's dedicated to your business. Do you really want the "generalist marketers" to trial and error on your dime?

Excavation Contractor Marketing
excavation and septic success netwrk group
Yellow excavator shaping a clean residential building pad at sunrise

Excavation Business Profitability: The Expenses and Margins Contractors Need to Track

October 02, 2026•13 min read

An excavation company can have machines moving, crews booked, estimates accepted, and a growing backlog while the owner still wonders why there is so little left over.

The invoices look healthy. The fleet is busy. The work is real. But so are the costs hiding inside every project: operator hours, labor burden, fuel, hauling, repairs, materials, rental equipment, mobilization, underbilled change orders, and the office costs that keep running whether a machine is productive or sitting still.

That is the reality of excavation profitability. More revenue does not automatically produce more profit. On the wrong jobs, or with the wrong cost structure, more revenue simply gives a company more opportunities to work hard for too little return.

For established excavation contractors, the answer is not generic advice about cutting costs. It is a system that shows which work earns margin, which assets are producing, which costs belong in every estimate, and whether the company still makes a fair profit after the owner is paid a real wage for the work they perform.

Excavation Uses Different Margin Math Than Septic Service

A septic pumping company can have a very different cost structure from an excavation contractor bidding site preparation, utility trenching, drainage, foundations, clearing, hauling, or septic excavation. Do not carry a high service-business gross-margin expectation into earthwork and assume the numbers are comparable.

In construction, gross margin is revenue minus direct job cost, divided by revenue. Direct job cost includes the labor, materials, equipment, trucking, and subcontracted work tied to a project. It does not include general office, shop, estimating, or other G&A expense. Net profit measures what survives after overhead and other company expenses are paid.

A reported gross margin of 40% to 50% can be valid for an excavation contractor. It may mean the company has excellent pricing and production. It may also mean that field labor burden, equipment ownership and maintenance, fuel, trucking, disposal, or other project costs are carried below the gross-profit line instead of inside direct job cost. The percentage alone cannot answer which one is true.

That is why a single borrowed gross-margin benchmark should never become a universal target. Construction CFO publishes a 21.0% gross-margin reference for $1M-$5M excavation contractors, based on a secondary trade benchmark it attributes to the SPM Trade Benchmark Reference. Its calculation treats labor, materials, equipment, and subcontracted work as direct job costs. That is a useful fully loaded comparison point only when a contractor uses substantially the same cost classification.

The owner should first reconcile the number. Keep a reported gross margin for historical consistency if the company wants it, but also build a fully loaded project-cost view that carries the field costs required to perform the work. Then judge the company on both its job profitability and the pre-tax operating profit that remains after legitimate overhead is paid.

Margin comparisonWhat the percentage can meanHow to use it
40% to 50% reported gross marginCan be valid when direct job cost is narrowly defined or when the company has unusually strong pricing and productionReconcile which field labor, equipment, fuel, trucking, and project costs sit below gross profit before comparing it with another contractor
21.0% fully loaded gross-margin referenceA secondary-source excavation benchmark that includes labor, materials, equipment, and subcontracted work in direct job costUse only as directional context when the company applies a comparable, fully loaded cost definition
Pre-tax operating profitWhat remains after direct job cost and operating overhead are paidA more comparable owner-level outcome across companies with different chart-of-accounts structures
8% to 12% broad contractor net-profit guidanceA third-party rule of thumb that varies by trade, risk, and accounting treatmentUse as a long-term discussion point, not a bid template or guarantee

A contractor performing high-risk sitework, public utilities, hard rock excavation, residential pads, trucking, or specialized drainage work will have different risk and production assumptions. The value of the comparison is not that every company should copy one percentage. The value is that every company needs a margin system that can explain where its own number comes from and whether enough profit remains after all legitimate costs are paid.

Direct Job Costs: The Expenses That Must Be Carried by Every Project

Direct job costs should rise because a project is being performed. The excavation owner needs to see them by project and by service line before the job is closed. A grading project, utility trench, driveway, drainage system, foundation excavation, site-prep package, and septic excavation project should not all be blended into one general cost bucket.

Direct job-cost categoryInclude these costsWhy it matters to excavation margin
Field labor and payroll burdenOperators, laborers, foremen, CDL drivers, payroll taxes, workers’ compensation, benefits, and owner field timeLabor overages can erase the margin before the owner sees a problem in the bank account
Equipment operating costExcavator, mini excavator, skid steer, loader, dozer, compactor, trencher, attachments, rental equipment, and job-specific wearA machine can be paid for and still be expensive to operate, transport, fuel, maintain, and idle
Fuel and transportationMachine fuel, truck fuel, mobilization, towing, trailer time, haul miles, and equipment deliveryEvery extra trip, long haul, and idle hour quietly lowers the project’s gross profit
Materials and imported aggregateStone, gravel, pipe, fabric, structures, erosion-control material, seed, and project-specific suppliesMaterial allowances must be tied to actual quantity, delivered cost, waste, and scope changes
Hauling, disposal, and truckingDump trucks, third-party trucking, disposal fees, export, import, and landfill or recycling costHaul distance and load count can turn an apparently good unit price into a weak job
SubcontractorsSurvey, drilling, blasting, trucking, paving, restoration, electrical, traffic control, testing, and specialty workA subcontractor proposal must be scoped, marked up, and tracked against approved change work
Permits, testing, and project controlsPermits, locates, compaction testing, traffic control, erosion control, staking, and job-specific complianceThese costs are real even when they are not visible in the excavator’s hourly rate
Rework, warranty, and unbilled scopeFailed density tests, return trips, repairs, owner-requested work, undocumented extras, and missed change ordersMargin disappears quickly when the field completes work that the office never bills

The most important discipline is to build job-cost codes that match the estimate. If the estimate assumed a certain number of excavator hours, truckloads, cubic yards, labor hours, or compaction tests, the job-cost report should show the actual number against the estimate while the job is still running. A report that only says the project is over budget after completion is history, not management.

Foreman checking equipment hours beside a compact excavator at a graded jobsite

Operating Overhead: The Expenses That Must Be Loaded Into the Rate

Gross margin pays for operating overhead before it pays the owner a profit. This is where many excavation companies get trapped. The direct job estimate may be reasonable, but the company has not allocated its fixed operating cost across the productive hours, crews, and revenue needed to carry it.

Operating overhead categoryCommon expensesQuestion the owner should review monthly
Office, estimating, and administrationAdmin payroll, dispatch, estimating support, project management, phones, office supplies, and accounting supportIs overhead staff capacity aligned with profitable revenue, not just total revenue?
Yard, shop, and facilitiesYard rent, shop rent, security, utilities, storage, maintenance supplies, and property upkeepDoes the current footprint support productive equipment and crew capacity?
Insurance, bonding, and licensingGeneral liability, commercial auto, equipment coverage, workers’ compensation, pollution coverage, bonding, permits, and licensesHave risk, insurance, and compliance increases been reflected in current pricing?
Fixed fleet and equipment commitmentsLoan payments, leases, interest, depreciation policy, and recurring ownership obligationsWhich asset must stay productive each month to justify its fixed cost?
General repairs and maintenanceShop labor, preventive maintenance, tires, repairs, tooling, and non-job-specific fleet costAre maintenance trends being seen early enough to schedule work rather than react to breakdowns?
Technology and professional servicesCRM, estimating software, GPS or telematics, payroll, bookkeeping, tax, legal, and safety supportIs each recurring expense saving time, protecting a margin, or helping win the right projects?
Marketing and business developmentWebsite, SEO, paid advertising, bid platforms, sales activity, referral partnerships, content, and networkingDoes marketing produce the job size, customer type, and gross profit the company actually wants?
Financing and working-capital obligationsInterest, debt service, credit-line costs, subscriptions, and other recurring commitmentsCan the company cover its obligations through an average month, not only during peak season?

A machine sitting idle is not automatically a problem. Sometimes capacity protects response time or allows a contractor to take on a profitable project quickly. But the owner should know how many productive hours each major asset needs to contribute before its payment, insurance, maintenance, and storage costs are justified. If that answer is unknown, the company is guessing at profitability.

The Same $1 Million of Revenue Can Show Two Different Gross Margins

The next table is a cost-classification reconciliation, not a forecast or a claim that one gross-margin percentage is universally correct. It shows how the same $1 million of revenue and the same $70,000 of pre-tax operating profit can display a 50% reported gross margin or a 21% fully loaded gross margin, depending on where direct field costs are classified.

$1 million reconciliation illustrationNarrow reported-cost viewFully loaded project-cost viewWhat changed
Revenue$1,000,000$1,000,000No change
Costs classified above gross profit$500,000$790,000$290,000 of field labor, equipment, fuel, trucking, and project cost is moved into direct job cost
Reported gross profit$500,000 / 50.0%$210,000 / 21.0%The gross-margin presentation changes because the classification changes
Field costs carried below gross profit$290,000$0Fully loaded job costing places these costs with the project
Operating overhead$140,000$140,000True overhead is unchanged
Pre-tax operating profit$70,000 / 7.0%$70,000 / 7.0%The bottom-line result is the same

The lesson is not that a 50% gross margin is wrong or that 21% is better. The lesson is to know exactly what your gross-margin figure includes. Once the company uses a consistent definition, the owner can see whether estimates are recovering the field cost, whether the overhead rate is funded, and whether the jobs leave a fair return after the work is complete.

The Production Numbers That Protect Margin in the Field

Excavation margin is often lost before the invoice is created. It is lost when the crew moves fewer cubic yards per hour than the estimate assumed. It is lost when an operator, machine, and truck wait on each other. It is lost when a haul route changes, when material is imported twice, when rock conditions are not priced, or when a density failure forces rework.

That is why the field needs a short production review, not only a long accounting report. The project manager or owner should be able to compare actual versus estimated equipment hours, labor hours, truckloads, haul miles, quantities moved, material received, subcontractor cost, and approved change work. Those are the levers that determine whether the gross-margin number survives.

Production metric to reviewWhat it reveals
Actual excavator, loader, and truck hours versus estimateWhether equipment production matched the bid assumption
Cubic yards moved, hauled, placed, or compacted per hourWhether the crew is achieving the production rate that supports the unit price
Actual labor hours versus estimateWhether staffing, site conditions, rework, or coordination is consuming the margin
Truckloads and haul distance versus estimateWhether transport cost is behaving the way the bid assumed
Material quantity and delivered price versus allowanceWhether import, export, aggregate, pipe, or other material cost is drifting
Approved versus unbilled change workWhether scope changes are creating revenue or becoming free work
Days sales outstanding and billing statusWhether the company is carrying project costs longer than it should

The 811 locate process, a clear tolerance-zone rule, density-test controls, documented scope changes, and timely billing may feel like separate operational tasks. They are financial controls. Each one protects the margin that was built into the bid.

Which Excavation Work Deserves More Marketing?

Marketing should not fill the calendar with every type of work. It should help the company win more of the work it can estimate accurately, perform efficiently, collect promptly, and complete at the margin it needs.

That means each service line should have a scorecard. For residential excavation, site preparation, grading, drainage, land clearing, utility trenching, septic excavation, hauling, or foundation work, track revenue, direct job cost, gross-profit dollars, gross-profit percentage, crew hours, equipment hours, callbacks, payment speed, and lead source.

When a contractor knows the gross profit per crew hour and per equipment hour for each service, the marketing decision becomes clearer. You can pursue more of the projects that fit your best equipment, crews, and customer relationships. You can also stop spending money to attract work that only keeps the crew busy while it underuses capacity or creates avoidable risk.

That is where excavation and septic contractors have an advantage. You already know the realities of the field. The missing piece is connecting that field knowledge to cost codes, estimates, pricing, marketing, and follow-up so the company chooses profitable work on purpose.

Build a Margin System, Not a Hopeful Estimate

A company does not improve from a margin benchmark alone. It improves when the owner can see actual cost early enough to act.

Build the estimate around the true production assumptions. Include direct job cost and a fair allocation of overhead. Track actual labor, equipment, hauling, material, and subcontractor cost against that estimate while work is active. Get scope changes documented and billed. Review whether the customer paid in the expected time. Then use those results to update future pricing, crew planning, equipment decisions, and marketing targets.

For an excavation company that is already established, this is not about chasing more random leads. It is about creating a system that delivers better jobs, stronger margins, and more control over the profit left after the site is clean and the machine is loaded.

Send us a message today to find out how Excavation Marketing Pros can help your excavation and septic business connect job selection, lead generation, estimate follow-up, and trackable ROI so marketing brings in profitable work, not just more activity.

Sources, Basis, and Assumptions

The 21.0% fully loaded gross-margin reference comes from Construction CFO’s excavation benchmark, which says it draws on the SPM Trade Benchmark Reference and defines direct job cost to include labor, materials, equipment, and subcontractors. It is presented here as a secondary-source, directional comparison point rather than a universal excavation-company target. CFMA’s 2024 Construction Financial Benchmarker Executive Summary provides broader construction context and reports a 21.8% gross-profit margin for its Best in Class group, not a specific excavation-industry average. CFMA’s construction financial-metrics guide supports the metric definitions. Procore’s construction margin-versus-markup guide explains why gross margin changes when cost classifications and markup assumptions differ. Foundation Software’s construction margin guide is used only for the broader 8% to 12% contractor net-profit discussion.

Basis: Gross margin is revenue minus direct job costs, divided by revenue. Pre-tax operating profit in the illustration is gross profit minus operating overhead. Time: Sources reviewed October 2, 2026. Assumptions: The $1 million reconciliation assumes $290,000 of field costs are classified below gross profit in the narrow reported-cost view, while the fully loaded view classifies those same costs as direct job cost. It is an illustration, not a forecast. Actual results vary materially by contract type, geography, labor availability, scope risk, equipment ownership, financing, and accounting policy. Sources and confidence: CFMA is the stronger industry association source for broad construction benchmarking. Construction CFO, Procore, and Foundation Software are third-party industry guidance. No cited source establishes a single correct gross-margin target for every excavation contractor. Compliance: This is business education and management analysis, not personalized financial, tax, insurance, or legal advice.

excavation business profitabilityexcavation contractor profit marginsexcavation job costingexcavation company expensesearthwork profit marginexcavation estimating
blog author image

Scott Andreasen

Scott Andreasen, runs Excavation Marketing Pros. An excavation contractor marketing firm specializing in helping excavation contractors to grow their businesses.

Back to Blog

You Want To Know The Difference?

  • You don't Need To Train Us On your Business.

  • You Will See results Fast.

  • You Will Have a Trusted partner.

excavation company marketing case study


"I have received value from Excavation Marketing Pros and would highly recommend them. Their online marketing has brought me in a tangible ROI with quality leads from Facebook, Google ads and SEO. I love using their sales pipeline and the organization of my new sales system. They do a great job keeping in contact with me on a regular basis and our communication has been clear. I would recommend them to any excavation companies serious about taking their business to the next level online.

Sincerely, William Wilson - Rockridge General Engineering & Excavation"

HOW CAN YOU DRIVE MORE REVENUE?

Get Found!

excavation company leads

You can sell more of your top residential money makers by effective excavation marketing for the services like the ones you see below.


What if your business started showing up in the search listings getting highly qualified traffic and leads for your premium services such as:

✔️Residential Excavation

✔️Driveways

✔️Pool excavations

✔️Backhoe work

✔️Concrete flatwork, driveways, sidewalks

✔️Daylighting/Underground utilities

✔️Paving

✔️Demolition

✔️Dirt & Gravel Road Construction

✔️Land Clearing/Forestry mulching

✔️Pond Excavation, Pond Construction

✔️Septic tank installations and repairs

✔️Septic Pumping

✔️Land Remediation / Land maintenance

✔️Lot clearing

✔️Site Work

✔️Road Grading

✔️Road Building

✔️Dozer work

✔️Full Site Preparation

✔️Site Reclamation

✔️Ditch and Berm construction

✔️Sewer Repairs

Based on the excavation services above there are literally hundreds of variations to show up for. All you got to do is tell us the jobs you want, let us do the rest including filtering out the jobs you don't want. Now that you got the idea, what if you compound all that new exposure in all your local surrounding areas where you operate...

Customer ROI Tracking!

Demolition leads

THE OLD WAY: "Yeah, I guess it's working because my phone rings sometimes."

THE NEW WAY: You will see PROOF, DOLLAR for DOLLAR where your leads are coming from, customers are coming from and your cost to acquire a new customer from each marketing channel along with YOUR TOTAL RETURN ON INVESTMENT! This way you can make smarter decisions with your business based on factual numbers .

When I ask: "So how many leads are coming from SEO or Facebook Ads or Google Ads or social media?"


The common answer most excavation company owners tell say is, "I got no idea." When asked, "How many new clients are coming from each marketing channel?" The response is almost always, "I got no clue."

Do you think you ought to know?

You will have set up for you the right systems for excavation contractors so you'll know EXACTLY where each client comes from, COST PER LEAD and ultimately your COST TO BUY A CUSTOMER FROM EACH MARKETING CHANNEL! Armed with that kind of information helps you make better decisions for your business with less stress and headaches.


Skyrocket Excavation Sales!

Land Clearing leads

Why should people hire your excavation company instead of your nearest competitor? The common answer we hear is, "Because I'm honest and provide a good service."


The thing is every excavation, demolition, septic, land clearing contractor and guy with a skid steer in your local area claims the SAME EXACT THING. What you need is a "USP." -Unique Selling Proposition.

Your story will be told to set yourself apart from the rest.


You'll be given proven CTAs "Calls To Action" based on current test data of what's working and the latest excavation marketing trends to compel your ideal dirt customers to want to hire you for the EXACT SERVICES YOU WANT TO SELL MORE OF!

"What If You Started Actually Showing Up For Your High Value Excavation & Septic Services That You Want To Do At Precisely The Exact Moment Your Potential Customer Wanted To Hire You?"

How Would That Impact Your Business?

Would you streamline your excavation business and only take on the projects you really want?

Would you hire another someone to replace yourself and free up your time?

Would you bring on another crew and expand?

Would you invest in more equipment?

Would you pay off your existing equipment?


INCREASE SALES WITHOUT THE STRESS HAVING TO MANAGE THE EXCAVATION MARKETING ON YOUR END.

Your Experts In Excavation Marketing👷

You want someone who knows the residential excavation or septic business... We get in, take action for you fast and produce the results you want based on your goals of where you're at and where you want to go.

pond leads for excavators

YOU OWN AN EXCAVATION COMPANY AND WANT MORE RESIDENTIAL OR COMMERCIAL PROJECTS. SO LET'S PUT TOGETHER A CUSTOM MARKETING STRATEGY FOR YOU TO GET THE RESULTS YOU REALLY WANT.

Excavation & Septic Company Marketing Strategies That Actually Work ⚙️

Are you ready to take your Excavation Company to the next level? Lets discuss your goals and get to know you and your business. Then we will put together a custom and detailed Excavation Accelerator Blueprint specific to your needs. You keep the blueprint whether we're a match to work together or not. $397.00 Value - Free for a limited time!

You Deserve The Unfair Advantage.

They can copy your name, cut corners, skip permits, and slash their prices—but they can’t match your results.

marketing plan for excavation companies

OUR MOTTO: If We Can't Make Your Excavation Company Money, We Don't Deserve Yours!

When you work with Excavation Marketing Pros® you'll see that we're results driven, straight to the point and get the job done. Here's what you'll love about us:

  • Fast Results, We'll Simply Plug You In To What Works... No Trial & Error!

  • Dedicated Account Manager... Unparalleled Customer Service Because We Love Our Customers & Treat Your Business Like it's Our Own.❤️😊

What Makes Us Different?

excvator ad copy

Proven PPC Ads For Excavation

Tapping in to the power of paid ads for excavation is a smart move. You'll have a carefully crafted a Google Ad campaign to get your phone ringing in days... not weeks or months.

excavation contractor paid ads

Bullseye Targeting For Your Ideal Clients

You can eliminate all the stress, trial and error for you... not to mention all the wasted time and money by trying "Generalist Marketers" or piecing together strategies on Youtube.

excavation company web designer

Web & Lead Analytics

You'll always know where your next client is coming from and have a predictable system in place for getting your ideal excavation clients ON DEMAND.

excavation contractor SEO

Client Acquisition Analysis

Watch us lower your cost to acquire a new customer over the first 90 days using a methodical approach, data analysis and Artificial Intelligence. In plain English... You'll be able to see lower cost leads through smart decision making and systems for your business, which in turn generates a lower cost to acquire a customer. You'll be able to see the numbers and track all this in our Excavation Lead Connector App.

excavation contractor advertising company

Reputation Management Earns Excavation Companies

It's bidding a race to the bottom if your reputation doesn't hold weight! The stronger your reputation the more you can charge for your services. High ticket clients want to see a solid reputation before spending big money, right? So instead of bidding lower prices then your competitors to get jobs why not increase your profitability by proactively increasing your 5 Star Reviews? You'll have a have a unique & proprietary excavation reputation management system.

Excavation Contractor Marketing Services

Identifying Your Super Power Then Promoting it.

Every excavation business is unique with it's own strengths and weaknesses. In our first discovery call, You'll have a new identity that sets you apart from your competitors and know how to tell your story to attract clients. Get ready to skyrocket sales to new levels based on Unique Selling Propositions, Seasonal Promotions and Calls to Action that are guaranteed to yield a strong return on investment.

COMMON REASONS PEOPLE TALK THEMSELVES OUT OF BOOKING A CALL:

I Got Too Many Leads As Is... Ask yourself why you are really on this page? What brought you here? How many of those leads are quality? Do you like spending your valuable time and resources chasing tire-kickers sifting through to find the few gems? Could there be a different approach to save you time and money? The only way to know is to book a call and to talk about your concerns and goals.


I Do My Own Marketing In House: Why is that?

Is it the best use of your time as the CEO or for your in house team?
Do you like doing it? Is it profitable? Do you know your cost per lead? You would probably agree most excavation business owners are better equipped at doing excavation rather than marketing.


I Can't Grow Past Where I'm At/I Can Handle The Work I Got!: Mark Cuban said it best, "Sales Cures All Problems In Business." There's always pain in growth. With more income you can afford to hire the best talent for your business. The only way to get more income is to sell more services, buy better machines, invest in better systems and so on. One way to increase profitability and scale is by doing less excavation work. By actually restructuring your service offers based on your most profitable excavation services that you can knock out the fastest. By having us target your most profitable excavation work you can complete the fastest, you trim the fat and become a lean power house. If that makes sense, book a call with us.


How Long Will It Take To See Results Marketing My Excavation Company?: We can get most campaigns running in 7-10 business days. With some marketing like paid ads, the leads can start flowing in at that moment. But a transformation in your business will not happen over night. You'll see a custom plan based on your goals when you schedule your call.

I Tried A Marketing Agency Before/Lead Company/SEO Company [insert thing you tried here]: It's disappointing when that happens. Sorry to hear that. Did the company you worked with actually specialize in excavation and septic businesses? That's a major difference. They just aren't equipped because they don't have the specific data or experience in the industry like serving your type of business. So in turn they must trial and error everything on your dime... But not us!

excavation marketing agency

Here2Help, LLC dba Excavation Marketing Pros™
All Rights Reserved


ADDRESS: 19046 Bruce B. Downs Blvd., # 1045, Tampa, FL, 33647

Excavation Marketing Pros is a Licensed trademark with serial numbers:
98026399, 98095462, 98070982

BEST KNOWN FOR: Excavation Marketing, excavation leads, land clearing marketing, Excavation marketing services, excavation marketing contractor, Pool Excavation Leads, Septic Business Growth, Excavation Business Growth, Demolition Leads, Construction leads, Landscape Construction leads, Land Clearing Leads, Pond Leads, Septic Leads, Land Remediation Leads, Lot clearing Leads, Site Work Leads, Road Grading Leads, Heavy construction marketing, Septic tank install leads, septic contractor marketing

*

*Any and all guarantees will be discussed on our call and formalized in writing. Applies only to Septic Sales Tsunami Program, New Clients Only. Cetain restrictions may apply. Average setup time of 2 business days depends on pre-existing client online assets. See earnings disclaimer.